Maple Grove Wood Flooring has installed, sanded and repaired wood flooring in New Hope for more than twenty years, and a large share of that work is booked against a closing date rather than against a homeowner’s own calendar. A seller calls, a listing goes up, and the first question is what actually has to be finished before the sale can complete.
That question has a narrower answer here than most sellers expect. The city has required a municipal inspection before any residential sale since 1978, and the published criteria that inspection runs on name no finished-floor or floor-covering item anywhere. Nobody from the city scores the surface you walk on.
So the wood work that clears a closing in this city is stair work — handrails, guardrails, loose treads — while the refinish of the floor itself is a market decision rather than a compliance one. We quote the two separately, because they answer to different deadlines and only one of them is required. What follows is how we sequence both.
Wood Floor Work on a New Hope Closing Timeline

Every wood floor job in a house that is about to sell is governed by two dates: when the inspector walks through, and when the buyer takes possession. Knowing the shape of that inspection first is what keeps a sanding crew from landing in the wrong week, and it is what keeps a seller from paying for a repair the city never asked for.
The Inspection That Has Run Since 1978
Since 1978 the city has required sellers to have the home inspected by a city inspector and to make any needed repairs before the home is sold. It is a true interior evaluation rather than a records check: an inspector from the Community Development Department’s Inspections Division enters the dwelling, issues a repair list, and returns to re-inspect once the work is done.
It applies to any residential property — single-family homes, condominiums, townhomes, cooperatives and apartment buildings alike. Where the unit sits inside an association, we quote against that building’s own recorded governing documents, which supersede and are often stricter than any single sound rating. The initial inspection runs about forty-five minutes to an hour on a single-family home and the final one about thirty minutes, so the calendar pressure sits on the repairs in between.
What the Criteria Actually Name
The Point of Sale Code Compliance Criteria are published as a sheet, and we read all of it rather than hunting for a flooring line, because there is no flooring line. The items that touch this trade sit under Stairways and Interior, and they are about handrails and guardrails rather than about the surface underfoot.
Elsewhere the sheet covers the basement, the sump pump and drain tile, garage floors, bathrooms and heating systems, and it closes by noting that the list is not all-inclusive. What it never names, anywhere on the sheet, is a finished floor, a floor covering, carpet or hardwood. We will not tell a seller the city is going to look at their floors in order to sell them a sanding job.
Basement Items Are Mechanical, and the Floor Is Ours
The basement and sump items are narrow and specific: a clean-out plug in the floor drain, two panes of glass in the windows, and a secured cover on the sump basket. They are about water leaving the house, not about the floor sitting over the slab. That distinction matters, because the lower level is where most of our own moisture work actually happens.
Before we quote anything for a lower level we take a reading on that slab itself, never inferring it from the floor above. We also set grade by the installation standard rather than by what a builder called the lot: soil sitting within three inches of a level’s floor puts that level below grade, walkouts included, which rules out solid strip and points to an engineered or floating assembly over a vapor retarder.
Looking for wood-flooring closer to Rogers? See Wood-Flooring in Rogers.
Stairs, Handrails and Guardrails, Priced Per Tread
The Four-Riser Handrail Threshold
Four or more risers is the line the criteria draw, and in these houses it catches more runs than sellers expect. A split entry has two short flights that both clear it, and the basement run almost always does. A rail that is loose in its brackets, or that stops short of the bottom newel, is a written repair even when the stair itself is structurally sound.
We rebuild those in wood to match the existing stair rather than surface-mounting something that reads as a temporary fix, since the buyer walking through is looking at the same handrail the inspector wrote up. Blocking behind the wall, a solid newel connection and a return at each end are what make a rail pass and keep it passing.
Guardrail on Open Sides Thirty Inches Up
The guardrail item covers open sides of stairways and landings that sit at least thirty inches above the adjoining grade. Open-sided landings at a side door, and open runs dropping into a lower level, are where it comes up — often on a half wall built back when the measurement was taken differently.
This is the point where a wood floor job stops being finish work. Rebuilding a guard or an open stringer is structural, so we quote it on a separate line from sanding and coating: the state rule exempts painting, papering, tiling, carpeting, cabinets, countertops and similar finish work from a building permit, and says in the same breath that the exemption does not authorize work in violation of the code.
Why Stairs Are Counted Per Tread
Floors are quoted per square foot and stairs are not. A tread, its riser, the nosing and the stringer beside it are four separate pieces of work, and the hand sanding, fitting and coating on a single step take about as long whether the stairway is thirty inches wide or forty-two. Counting a stair run as floor area understates it every time.
So a written quote from us carries a price per square foot for the floors, the minimum project size that price assumes, and a separate per-tread figure for the stairs, all of it before a crew arrives. Overwood at a nosing, a tread that squeaks under load and a worn front edge are each their own line, so a seller holding a repair list can see which of them the list actually requires.
The 1960s Oak Under the Carpet
One Peak Decade, and It Is Not the Fifties
Of 9,229 housing units in the city, 3,734 were built between 1960 and 1969 — 40.5 percent, and the largest decade by a wide margin. Fewer than one unit in seven predates 1960 at all. That concentration is why so many of these houses share a floor system rather than a style.
The owner-occupied detached pool is 3,961 houses, and those are the ones where carpet pulled up the week before a listing turns into a phone call. Families touring them are usually buying into Robbinsdale Area Schools, Independent School District 281, which runs Robbinsdale Cooper High School and Meadow Lake Elementary inside the city, and a tired floor is among the first things they notice.
What Comes Up With the Carpet
Under carpet of that era we usually find red oak solid strip, tongue and groove, structurally sound and cosmetically rough. Tack strip holes around the perimeter, staple lines from a later pad, and a darkened border where the carpet stopped short of the wall are all normal findings, and all of them sand out.
What we measure before quoting a sand is how much material is left above the tongue, because a floor already through two or three sandings has a thinner margin than it looks. Where an engineered floor turns up instead, the wear layer decides the answer outright: under the sanding threshold the honest quote is replacement, not a refinish that sands through on the first pass.
Pre-1978 Houses and the Federal Renovation Rule
Better than three-quarters of the city’s housing was finished before 1980, so the 1960s peak sits well inside the pre-1978 window the federal Renovation, Repair and Painting Rule covers. That rule is one reason we describe dust containment by the machine on the truck and where it vents, rather than by the word dustless.
Minnesota is not an authorized state running its own version of the program, so the federal rule and its firm and renovator certification requirements govern directly here. It is a fair question to put to anyone proposing to open up a floor, a stair or a subfloor in a house of this age, and a better question to ask before the work is booked than after.
Selling As-Is: Escrow and the Ninety-Day Clock
When the Seller Cannot Make the Repairs
Not every seller can finish a repair list before closing, and the city has a documented route for that. If the seller is physically or financially unable to make the repairs, the home may be sold as-is provided the buyer commits to making them, and only where no safety or hazardous conditions exist on the property.
That route is secured with money rather than a promise: a cash escrow at least equal to the determined valuation of the repairs, posted with an attorney, closing company or title company, with a five hundred dollar minimum. The city cannot hold escrow checks itself. A written per-tread quote is often what sets that valuation, which is one more reason we put the number on paper.
The Re-Inspection Within Ninety Days
Once the repairs are done a re-inspection is scheduled, and it has to be completed within ninety days of closing. That clock belongs to whoever committed to the work, so a buyer taking an as-is house inherits a deadline along with the stair list. We schedule against it deliberately, since acclimation alone can take a couple of weeks before anything is fastened down.
The paperwork end of it is the Certificate of Property Maintenance, which the city issues after the specified repairs are made and the home passes its final inspection. The initial and final inspections are covered by the application fee, while each inspection needed after those two carries a fifty dollar charge — the quiet cost of guessing at a repair instead of quoting it.
Sequencing a Refinish Around the Listing Date
A refinish is not on the city’s list, but it is on the seller’s, and it is the item most often started too late. Our quotes name the finish chemistry, the coat count and the cure schedule, with the dates furniture, rugs and pets can come back stated as dates rather than as a shrug.
Waterborne polyurethane and oil-modified polyurethane do not share a schedule, and a screen and recoat on a floor with finish left is a two-day answer where a full grit sequence is a week. We also name the heated season before booking rather than after. State law holds a rented home at a minimum of 68 degrees from October 1 through April 30, and that seven-month stretch is when seasonal gapping and dry cupping turn up in a floor.
- 20+ Years Experience
- Written Price Per Square Foot
- Moisture Tested Before Quoting










